An extension quote is not a bathroom or kitchen quote. The client cannot say yes on the night even if they want to, because there is a design to finish, possibly a council approval, a building permit and a bank that will not lend until most of that is done. The quote can sit for months, and the builder who goes quiet in that gap is the one who loses it to whoever rang last. This guide maps follow-up to each of those stages, with five templates, the 2024 granny flat change, the WA deposit rules worth saying out loud, and what to send past clients. It is general guidance, not legal or financial advice.
The short version
- Follow up at day 2 and day 7, then at every stage: design sign-off, lodgement, approval, finance, contract. Never let more than a month pass without a message, unless the client asked for that.
- The wait is long. Design takes about six to eight weeks, approvals a few weeks to four to six months, and the building permit 10 or 25 business days.[2][5] That is nearly three months at the quick end and more than eight at the slow end.
- Finance waits on you. Lenders usually want council approval, stamped plans and a fixed-price contract before they approve an extension loan.[6] Send that pack the day approval lands.
- Granny flats got simpler in April 2024: compliant ones up to 70m² need no development approval on residential lots of any size, subject to local conditions, though a building permit is still required.[7][8][9] Extensions did not get that change.
- Every commercial message names your business and carries an opt-out, actioned within five business days.[14]
Why extension quotes stall
The money. One Perth extension builder puts ground-floor extensions from $200,000, with most between $250,000 and $500,000.[1] A Perth second-storey builder gives a typical range of $400,000 to $600,000 or more, with its own pricing from $380,000.[3] A cost-guide site puts a ground-level extension at $2,500 to $5,000 per square metre, $3,500 typical.[4] These are builders’ and a cost guide’s figures, not a market survey, but they agree on the point that matters: at that money many clients need finance, and when they do, the bank sets the pace.
The stages. Each one is a few weeks where the client hears nothing unless you tell them something.
- Design. About six to eight weeks, depending on how complex the project is and how much design development it needs.[2]
- Council approval. Where an extension needs one, it can take only a few weeks or four to six months.[2] Whether it does depends on the design, the lot and the local planning scheme, so do not promise either way until you have checked.
- The building permit. The permit authority has 10 business days to decide a certified application and 25 business days for an uncertified one.[5]
- Finance. An Australian broker sets out what lenders want: council approval and stamped plans before the loan application can go ahead, and a fixed-price building contract with the total cost, an itemised progress payment schedule and a completion timeframe.[6] So the client’s finance is waiting on paperwork that you hold.
- The build itself. About 16 to 20 weeks or more for a home extension, and five to ten months for a second storey.[2] Clients who want to be finished by Christmas or before a baby arrives work backwards from that, and a slow reply costs you the slot.
Add the stages up and the gap from first quote to a start on site is close to three months when everything is quick (six weeks of design, a quick approval, a certified permit) and more than eight months when approval takes the long road. Every one of those weeks is a chance for another builder to get a call back in first.
A follow-up timeline mapped to each stage
Day counts run from the day the quote or preliminary estimate goes out. After day 7 the triggers are stages, not dates, because nobody can predict how long council will take. Any "no thanks" closes the file.
| Stage | Channel | What it says | Why then |
|---|---|---|---|
| Quote (day 0) | Email with the quote, plus a one-line text that it has gone | What is included, what is an allowance, and the stages between now and a start date | Sets the expectation that this takes months |
| Day 2 | SMS | Did it come through, and is anything worth a quick call? | Finds out whether they are comparing, designing or waiting on the bank |
| Day 7 | Email, quote reattached | The stages and rough timing, what the lender will ask for, the 6.5% deposit cap and home indemnity insurance | Answers the questions they have not asked[2][6][11] |
| Design sign-off | Call, then email | Plans signed off; what goes to council or the surveyor next, and when | The first point a client can start to doubt the timeline |
| Council lodgement | SMS | Lodged on [date]; approvals can take a few weeks or several months; you will hear from us when it moves | Turns silence into a waiting period they expected[2] |
| Every 3 to 4 weeks while waiting | SMS | Still with council, nothing needed from you | Keeps you the builder they are thinking about |
| Approval | Email the same day | The approval, stamped plans and fixed-price contract, ready for the lender | The lender pack is what finance is waiting on[6] |
| Finance | SMS on the date they gave you | "You said the bank would come back by now. Anything they need from us?" | The longest silence, and the easiest to fill |
| Contract | Email, then SMS once the permit is lodged | Deposit amount, insurance certificate, permit lodged and decision due within 10 or 25 business days | Locks in the start date[5][11] |
Get the quote out quickly first. Buildxact, the estimating software, reported in March 2026 that estimates sent within 2 days of the request had a 32% win rate, falling steadily after that.[12] That is drawn from its users worldwide, not Australia alone, and covers builders in general rather than extensions, so read it as a direction rather than a benchmark.
The day 2 and day 7 part is the same rhythm we build for other trades; the quote follow-up page shows how it runs from your job software. The stage triggers are what make it work for extensions.
Granny flats: the 2024 change as a reason to decide sooner
Since 10 April 2024, an R-Code compliant granny flat (an ancillary dwelling, in planning terms) can be built on a residential lot of any size without development approval, as long as it meets the local setback requirements and is no more than 70m².[7] For a client sitting on a granny flat quote, that removes the stage that makes extensions slow, and it is worth saying so in your follow-up.
Say it carefully, though. The exemption has conditions, and councils spell them out differently:
- It must comply. The City of Joondalup lists R-Code compliance including height and setbacks, a 70m² cap, and matching the main house’s colour, roof pitch and materials; it adds that structure plan areas may carry extra requirements.[8]
- Rural land is different. The City of Gosnells states the property must not be zoned Rural.[9]
- A building permit is still required for every granny flat.[8]
So the honest line in a follow-up is: "If your block is residential and the design complies, there is usually no council planning approval, just the building permit. We will confirm that for your lot before you commit." Then confirm it.
Price, for context. One Perth builder lists granny flats from $171,218 for one bedroom and $183,555 for two, base build only, with finishes and site works on top.[10] At those prices the client is still likely to need finance, so the lender pack in the timeline still matters.
Extensions did not get this change. The 2024 exemption is for ancillary dwellings. Do not tell an extension client their job is exempt because a granny flat would be.
What to say before contract
Two rules from Building and Energy answer questions most clients never ask out loud.[11]
- The deposit cap. The Home Building Contracts Act covers fixed-cost home building contracts from $7,500 to $500,000, including renovating or altering an existing home. On those, the most a builder can take as a deposit is 6.5% of the contract price: $16,250 on a $250,000 extension, $11,129 on a $171,218 granny flat. Contracts above $500,000, which takes in many second storeys, are outside that cap. The contract has to be in writing and signed by both sides, and the client gets the Notice for the homeowner before signing.[11]
- Home indemnity insurance. It is required for building work that needs a permit and is worth more than $20,000, which is every extension and granny flat at Perth prices. It can cover a lost deposit up to $40,000.[11] Name your insurer in the day 7 email; it reassures without a sales line.
Put both in writing before the contract stage, not at it. A client who learns at signing that their deposit is capped wonders why you did not mention it; a client who read it in week one trusts the rest of what you sent.
Five templates for the long wait
These are builder quote follow-up templates written for Australian rules. Words in brackets are yours to fill. They follow the SMS compliance guide: every message names the business by its legal name (or name and ABN), and anything that promotes, such as a price hold or a build slot, carries "Reply STOP to opt out". Opt-outs have to be actioned within five business days, in every tool that holds the number.[14] A factual update on a quote or a job the client asked for is closer to a service message, so templates 1 and 3 leave STOP off. Add a sales line to them and they need it. If in doubt, add it.
1. Day 2, SMS:
Hi [first name], [your name] from [business name]. Your extension quote went out [day]. Did it come
through OK? Happy to walk you through the design and approval steps on a quick call.
2. Day 7, email. Subject: Your extension quote, and what happens between now
and a start date
Hi [first name], the quote is attached again in case it got buried. A few things people ask at
this point:
Design: about [6 to 8] weeks from sign-off of the brief.
Approval: [we expect this needs / does not need] council planning approval. If it does, it can take
anywhere from a few weeks to several months. The building permit then takes up to 10 business days
(certified) or 25 (uncertified).
Finance: most lenders want the approval, stamped plans and a fixed-price contract. We will send you
all three together the day approval comes through.
Deposit: on a contract this size the most we can ask before starting is 6.5%, which is $[amount].
Insurance: home indemnity insurance is included, through [insurer].
Reply with any question, or pick a time for a call: [link]. If you would rather not hear from us about
this, just reply and say so.
[Your name], [business name], [phone]
3. While council has it, SMS:
Hi [first name], [business name] here. Quick update on [address]: the application is still with
[council], lodged [date]. Nothing needed from you. We will text the day it moves.
4. Approval day, email. Subject: Approved: everything your lender needs
Hi [first name], good news, [council] has approved the plans. Attached: the approval, the stamped
plans, and our fixed-price contract with the progress payment schedule. That is the pack most lenders
ask for. Our [month] start slot is held for you until [date]. Any questions, reply here or call
[phone].
[Your name], [business name]. Reply STOP or unsubscribe here: [link].
5. The date they gave you, SMS:
Hi [first name], [your name] from [business name]. You mentioned the bank would come back around
[date]. Anything they need from us? The [month] start is still open until [date]. Reply STOP to opt
out.
Granny flat variant for template 2: swap the approval paragraph for "On a residential lot, a compliant granny flat up to 70m² usually needs no council planning approval, just the building permit. We have checked [address] and [it qualifies / it needs approval because ...]." Only send it after you have checked.[7][8][9]
Never send any of them with the brackets left in.
Past clients: the second stage
Extension clients are often not finished. The budget stopped at the ground floor, the patio was left for next year, or the old kitchen and bathroom now look tired next to the new rooms. They already know your work.
- Keep it related to the job you did. Consent can be inferred from an existing relationship only where the promotion relates directly to it.[13] The second stage of the extension you built, or the patio off the new living room, fits. An unrelated service you have never quoted them on is a stretch.
- Ask at handover from now on. One line on the handover form ("Happy to hear from [business name] about future stages of this work") turns inferred consent into express consent, which is what ACMA prefers.[13]
- Time it. A text twelve months after handover, when the client has lived in the space and the first-stage spending has settled, lands better than one in month two.
- Quotes that were never accepted are different again: follow up the quote they asked for, hold the promotions, and close the file when they say no.
A past-client text, for example: Hi [first name], [business name] here. It is a year since we finished your extension. You mentioned the [patio / second stage] might be next. Want us to price it while our [season] diary is open? Reply STOP to opt out.
The customer reactivation guide covers pulling the list out of your job software and the consent rule in full.
What to track
Five numbers, counted monthly, in a spreadsheet with one row per quote. The stage column is the one most builders skip, and it is the one that tells you where quotes go to die.
| Number | How to count it | What it tells you |
|---|---|---|
| Days to quote | Days from site visit to quote sent | Whether quoting speed is the bottleneck |
| Open quotes by stage | How many sit at design, council, finance and contract right now | Where the pipeline is stuck, and what to send next |
| Days since last contact | For each open quote, days since you last sent anything | Anything over 30 is a quote you are drifting away from |
| Win rate | Contracts signed, divided by quotes sent | The number that pays; note the stage and reason for every loss next to it |
| Past-client jobs | Jobs from previous clients this year | Whether the second-stage messages are working |
Compare your own numbers month to month rather than against someone else’s benchmark. If quotes are lost at the finance stage, the lender pack is late or incomplete. If they are lost before design, it is the price or the first week of follow-up.
Frequently asked questions
How long should an extension builder follow up a quote?
Until the client says no or the job starts. An extension can sit anywhere from about three months to more than eight between first quote and a start on site while design, council approval, the building permit and finance run their course. Follow up at day 2 and day 7 after the quote, then at each stage: design sign-off, lodgement, approval and finance. Stop chasing the moment they say no, and go quiet between stages only if you have told them when you will next be in touch.
Do granny flats need council approval in WA?
Often not, but check the lot. Since 10 April 2024 a granny flat (an ancillary dwelling) that complies with the R-Codes, meets local setbacks and is no more than 70 square metres can be built on a residential lot of any size without development approval. Councils add conditions: some say the property must not be zoned Rural, some require the granny flat to match the main house, and structure plan areas can add requirements. A building permit is still required in every case. Ask the local council before you promise a client there is no approval step.
When should I follow up if the client is waiting on finance?
Ask them for a date, then follow up on that date. Lenders usually need the council approval, stamped plans and a fixed-price contract before they will approve construction finance for an extension, so the useful message is the one that hands the client that pack the day approval lands. After that, check in on the date they gave you, and once more two weeks later if they have gone quiet.
Do extensions get the same exemption as granny flats?
Do not assume so. The April 2024 change was about ancillary dwellings: compliant granny flats up to 70 square metres. It does not say anything about extensions to the main house. Whether an extension needs development approval depends on the design, the lot and the local planning scheme, and it always needs a building permit. Check with the council for each site.
How much deposit can a WA builder ask for on an extension?
If the contract is a fixed-cost home building contract between $7,500 and $500,000, the maximum deposit is 6.5% of the contract price: $16,250 on a $250,000 extension and $32,500 on $500,000. Contracts above $500,000 are not subject to that cap. Home indemnity insurance is required for building work that needs a permit and is worth more than $20,000, and it covers a lost deposit up to $40,000.
Can you run this follow-up for me?
Yes. We set up the day 2 and day 7 follow-up and the stage-by-stage messages from your job software or quoting tool, in your voice, with your business name on every message and a working STOP on anything that promotes, and we stop it the moment a client replies. We do not sell leads. Setup is $999 for the first three clients and $1,500 after that, then $197 a month, and the first 8 booked estimates are free.
If you would rather not run it yourself
Everything above works with a phone, an email account and a spreadsheet. If you would rather it happened without you, we build and run it: the day 2 and day 7 follow-up triggered from your quoting tool, the stage updates while council and the bank take their time, and the past-client messages, all in your voice with your business name and a working STOP. We do not sell leads; we follow up the ones you already have. Setup is $999 for the first three clients and $1,500 after that, then $197 a month, and the first 8 booked estimates are free. We do not have an Australian client to show you yet, so there is no case study here. The details are on the renovators page, or book a half-hour call.
Sources
Every figure above traces to one of these. All checked 21 October 2026; prices as on the linked pages.
- Addstyle — Home extensions. A Perth extension builder’s FAQ: ground-floor extensions start from $200,000, with most projects between $250,000 and $500,000. A builder’s own pricing, treated as indicative.
- Addstyle — Renovation and extension timeframes in Perth. Design about six to eight weeks; approvals from a few weeks to four to six months; a home extension about 16 to 20 weeks or more to build; a second storey five to ten months.
- Amerex — Second storey addition cost. A Perth second-storey builder: typical range $400,000 to $600,000+, with its own pricing starting from $380,000. Builder pricing, treated as indicative.
- What’s the Damage — Builder cost Perth (updated October 2026). Ground-level extension $2,500 to $5,000 per square metre, $3,500 typical, including GST. A cost-guide website, not a builder: one estimate among several.
- City of Cockburn — Building permit. Under the Building Act 2011, 10 business days to decide a certified application and 25 business days for an uncertified one.
- TNT Financial — Avoid these 5 extension financing mistakes. An Australian credit licensee: lenders need council approval and stamped plans before the loan application proceeds, and most approve construction finance only against a fixed-price contract with a progress payment schedule.
- WA Government — Revised R-Codes now in effect (16 April 2024). Since 10 April 2024, R-Code compliant granny flats can be built on residential lots of any size without planning approval if they meet local setback requirements and do not exceed 70m².
- City of Joondalup — Ancillary dwellings (granny flats). Generally exempt from development approval when deemed to comply with the R-Codes and no more than 70m²; must match the main house’s colour, roof pitch and materials; structure plan areas may add requirements; a building permit is required for all granny flats.
- City of Gosnells — Ancillary dwellings. The exemption requires compliance with setbacks, no more than 70m², and a property not zoned Rural.
- Summit Homes — How much does a granny flat cost? (1 July 2026). Perth starting prices: 1-bedroom from $171,218, 2-bedroom from $183,555. Base build only; finishes and site works are extra. A builder’s own pricing.
- Building and Energy, WA Government — Building or renovating your home. Home Building Contracts Act covers fixed-cost contracts of $7,500 to $500,000, including renovating or altering an existing home; maximum deposit 6.5%; contract in writing and signed by both; Notice for the homeowner before signing; home indemnity insurance for permit work over $20,000, covering a lost deposit up to $40,000.
- Buildxact — State of the Customer report release (25 March 2026). Estimates sent within 2 days have a 32% win rate, and the rate keeps falling after that. Drawn from Buildxact’s global user base: vendor data, not an Australia-only or extension-specific figure.
- Addisons — The ACMA’s expectations for using consent. Consent can be express or inferred from an existing relationship; inferred consent needs the promotion to relate directly to that relationship; ACMA considers express consent best.
- Prosper Law — Unsubscribe requests and the five-day rule. Opt-outs must be actioned within five business days; the unsubscribe must keep working for at least 30 days after sending.
Every quote followed up in your voice, stopped the moment they reply.
GuideCustomer reactivationThe timed text to past customers, with the consent rule and templates.
GuideSMS compliance for tradiesConsent, identification, unsubscribes and the penalties, in plain English.
More for Perth trade businesses: every article and free tool.