A kitchen quote is rarely lost on the night you send it. It is lost in the weeks after, while the client waits on a benchtop decision, gets two more prices, walks through the flat-pack aisle and wonders whether yours was worth it. The cabinet maker who stays in touch through those weeks, with something useful to say, is usually the one who gets the job. This guide maps follow-up to the steps a kitchen or joinery job actually goes through, with five templates, an honest answer to "flat-pack is cheaper", the WA deposit rule for cabinetry and what to send once the kitchen is in. It is general guidance, not legal advice.
The short version
- Follow up at day 2, day 7 and day 14, then at the steps that matter: after the selections meeting and before your next manufacture slot fills.
- They are comparing. Most people get three or four cabinetry quotes, and on the same specification those quotes usually land within 5 to 10% of each other.[5] Help them compare like with like and you are not just the cheapest or dearest number.
- WA lets cabinet makers take up to 20% deposit where off-site work is more than half the contract price, instead of the usual 6.5%. Custom-made cabinets only, not off-the-shelf.[6][7][8]
- If the job came through a builder, follow up the builder. The homeowner is their client.
- Every commercial message names your business and carries an opt-out, actioned within five business days.[14]
Where cabinetry quotes stall
The money. A Perth cabinet maker puts installed cabinetry for a standard family kitchen at $12,000 to $22,000, and a larger kitchen with a pantry or butler’s pantry at $20,000 to $35,000 or more.[1] A cost-guide site puts custom cabinetry from a cabinet maker at $12,600 to $36,750, $19,950 typical.[2] That is a real decision for most households, and nobody makes it in a day.
The steps. Each one is a place the quote can go quiet.
- The measure. You have been in the house and seen the room. The client has seen you. It is the warmest the lead will be until the quote lands, so say when the quote is coming.
- The design and quote. The client now has a number and a drawing, and a dozen questions they will not ring you about: what is an allowance, what happens with the old kitchen, when could it be in.
- The benchtop. Stone, laminate or something else changes the price and often the timing. A client who has not decided on the benchtop has not decided on the kitchen.
- Comparing quotes. The Cabinet Makers Association of WA tells homeowners to get a detailed plan and specification so the quotes they collect are for exactly the same work, and warns that some quotes come in lower on lower-end specifications.[4] It also says a quote considerably lower than the rest should be discounted, since materials are usually around half the cost.[5]
- The flat-pack anchor. Somewhere in that comparison is a flat-pack price, and it is lower. More on that below.
- Selections, then manufacture. One Perth kitchen maker allows about 2 weeks for selections and about 5 for manufacture.[3] Another puts manufacture at 2 to 4 weeks after design approval, then 2 to 5 days to install.[1] So a client who wants the kitchen in before Christmas or before guests arrive is working backwards from your factory slot, whether they know it or not.
A follow-up timeline tied to the steps
Day counts run from the day the quote goes out. After day 14 the triggers are steps, not dates. Any "no thanks" closes the file.
| When | Channel | What it says | Why then |
|---|---|---|---|
| After the measure | SMS the same day | Thanks for having us; your design and quote will be with you by [day] | Sets a date, so the quote is expected rather than chased |
| Quote (day 0) | Email with the quote and drawing, plus a one-line text that it has gone | What is included, what is an allowance (benchtop, handles, appliances), and the steps to installation | Answers the first questions before they are asked |
| Day 2 | SMS | Did it come through, and is anything worth a quick call? | Finds out whether they are comparing, stuck on the benchtop or just busy |
| Day 7 | Email, quote reattached | Benchtop options and how they change the price, the timing from selections to install, the deposit | The questions people have by now[1][3][8] |
| Day 14 | SMS or call | If you are comparing quotes, here is what to check is the same in each | Most people get three or four quotes[5] |
| After the selections meeting | Email the same day | The selections confirmed, the final price, and the manufacture slot it fits | Turns a showroom visit into a written commitment |
| Before the manufacture slot fills | SMS | Our [month] slot closes [date]; after that installation moves to [later month] | A real deadline, not a sales one |
| No reply after that | One last SMS | Shall I close this one off? No problem either way | Gets you an answer, and often a yes |
Get the quote out quickly first. Buildxact, the estimating software company, reported in March 2026 that estimates sent within 2 days of the request had a 32% win rate, falling after that.[12] That comes from its users worldwide, not Australia alone, and covers builders in general rather than cabinetry, so read it as a direction rather than a benchmark. If your design takes a week, tell the client that at the measure and the clock starts from there.
The day 2 and day 7 part is the same rhythm we build for other trades; the quote follow-up page shows how it runs from your quoting tool. The selections and slot messages are what make it fit a cabinetry job.
Five templates
These are cabinet maker quote follow-up templates written for Australian rules. Words in brackets are yours to fill. They follow the SMS compliance guide: every message names the business, and anything that promotes, such as a slot deadline or a price hold, carries "Reply STOP to opt out". Opt-outs have to be actioned within five business days, in every tool that holds the number.[14] A factual check on a quote the client asked for is closer to a service message, so templates 1 and 2 leave STOP off. Add a sales line to them and they need it. If in doubt, add it.
1. Day 2, SMS:
Hi [first name], [your name] from [business name]. Your kitchen design and quote went out [day].
Did it come through OK? Happy to talk through the benchtop options on a quick call.
2. Day 7, email. Subject: Your kitchen quote, and the questions people ask
next
Hi [first name], the quote and drawing are attached again in case they got buried. A few things
people ask at this point:
Benchtop: the quote allows for [laminate / stone]. Changing to [other] is about $[amount] more or less.
Timing: once selections are done, we manufacture in about [x] weeks and install in [x] days.
Deposit: [x]% on signing, which is $[amount], with the balance [at delivery / on completion].
Reply with any question, or pick a time for a call: [link]. If you would rather not hear from us
about this, just reply and say so.
[Your name], [business name], [phone]
3. Day 14, SMS:
Hi [first name], [business name] here. If you are comparing kitchen quotes, it is worth checking
each one has the same board, doors, hardware brand and benchtop, and whether installation is
included. Happy to go through ours line by line. Reply STOP to opt out.
4. After the selections meeting, email. Subject: Your selections and final
price
Hi [first name], thanks for coming in. Attached: your selections ([board], [door profile],
[handles], [benchtop]) and the final price of $[amount]. That fits our [month] manufacture slot, with
installation the week of [date]. The slot is held for you until [date]. Any changes, reply here or call
[phone].
[Your name], [business name]. Reply STOP or unsubscribe here: [link].
5. Before the slot fills, SMS:
Hi [first name], [your name] from [business name]. Our [month] manufacture slot closes [date].
After that the next install date is [later month]. Want me to hold it for you? Reply STOP to opt
out.
Only send template 5 when the slot really does close. Never send any of them with the brackets left in.
The flat-pack objection, answered honestly
"We could get it from IKEA or Kaboodle for half that." Sometimes they can. A Perth cabinet maker puts flat-pack or assembled cabinets at roughly $300 to $900 per linear metre for boxes and standard doors, with assembly and installation on top, against about $1,200 to $2,200 per linear metre installed for custom melamine or thermofoil.[1] A cost-guide site puts a whole budget renovation built on flat-pack cabinetry (it names kaboodle, IKEA Metod and Kinsman) at $12,600 to $26,250, including a laminate benchtop and entry-level appliances.[2] Do not pretend the gap is not there. Help the client see what is in it.
- Agree first. "Yes, flat-pack is usually cheaper to buy." A client who hears you admit that trusts the rest of what you say.
- Compare what each price includes. Who measures, who assembles, who installs, who templates and fits the benchtop, and who comes back if a door does not line up. The flat-pack figure often covers the boxes and doors only.[1]
- Compare the same specification. The association’s advice to homeowners is the same advice that helps you: the same board, the same hardware, the same work.[4]
- Say what custom means. Made to measure for that room, in your workshop. That is also why WA treats it differently for deposits: the 20% exception covers custom-made cabinets, not off-the-shelf ones.[6][7]
- If flat-pack really suits them, say so. A rental, a tight budget, a simple straight run. Point them to it, and ask whether you can quote the robes or the laundry later. That is how you get the next job.
Do not quote flat-pack prices you have not checked, and do not run down a named brand. Stick to what is in your price and what is in theirs.
WA deposit rules and the pre-contract notice
Under the Home Building Contracts Act, a "builder" includes cabinet makers, and home-building work includes cabinetry.[6][8] Three numbers are worth knowing before you send the day 7 email.
- The range. The Act covers home building work contracts from $7,500 to $500,000. Outside that range there is no statutory deposit limit.[8] A small vanity or laundry job can fall under $7,500.
- The usual cap is 6.5%. That is the most a builder or tradesperson can ask before work starts on a covered contract.[8]
- The cabinetry exception is 20%. Where the contract is for cabinetry work and the off-site work is worth more than 50% of the total, the deposit can be up to 20%. Cabinetry work means making and installing kitchen, bathroom, laundry and other custom-made cabinets and fitments, or refurbishing and repairing fitted ones. It does not include buying and installing off-the-shelf cabinets.[6][7] On a $20,000 kitchen that is $4,000 rather than $1,300.
The notice. Before the client signs, you give them the Notice for the homeowner, and the contract has to be in writing and signed by both of you.[8] The notice was amended in 2020 to show the cabinetry exception, so use the current version.[6][7]
Is this still current? Yes, as far as we can confirm. The 20% rule came in with the 2020 amendment regulations described in Industry Bulletin 130.[6] It is regulation 3A of the Home Building Contracts Regulations 1992 in the official version as at 1 September 2025[7], and Building and Energy’s homeowner page, updated in September 2026, still states both the 6.5% cap and the 20% exception.[8] The Act is under review, with final recommendations due to government from September 2026,[9] so check the Building and Energy page before you rely on these figures.
Insurance. Home indemnity insurance is for work that needs a building permit and is worth $20,000 or more, so the association notes it is not required for stand-alone cabinet making contracts.[10] Do not promise a client cover you do not hold.
Put the deposit in the day 7 email, not at signing. A client who reads it in week one trusts the rest of what you sent.
Robes, laundry and vanity after the kitchen
A client who loves their new kitchen is the easiest quote you will ever win for the robes. A Perth wardrobe maker puts built-in wardrobes at $2,000 to $12,000 or more, with three bays from $5,419.[11] That is a real job, from someone who already has your number.
- Be careful what you promote. Consent can be inferred from an existing relationship only where the promotion is directly related to it.[13] A check-up on the kitchen you made fits. Wardrobes, a laundry or a vanity may or may not, and that is a judgement you do not want to defend.
- So ask at handover. One line on the handover sheet ("Happy to hear from [business name] about robes, laundry and other cabinetry") turns a grey area into express consent, which is what the ACMA prefers.[13]
- Time it. A message a few months after handover, once they have lived with the kitchen, lands better than one in week two.
For example: Hi [first name], [business name] here. Hope the kitchen is treating you well. You mentioned the robes in the main bedroom might be next. Want us to measure while our [month] diary is open? Reply STOP to opt out.
The customer reactivation guide covers pulling the list out of your job software and the consent rule in full.
When the job came through a builder
Plenty of Perth cabinetry comes through builders and renovators rather than straight from the homeowner. Different job, different follow-up.
- Do not follow up the homeowner directly. They are the builder’s client, and the price you gave went to the builder. Going around them is the quickest way to stop getting their work.
- Follow up the person who asked. The estimator or the supervisor: did the price arrive, does it need anything changed, and when do the client’s selections close.
- If the homeowner rings you, help them, and copy the builder on anything that changes the price or the timing.
- Keep homeowners from builder jobs off your marketing list unless they ask to be on it.
What to track
Five numbers, counted monthly, in a spreadsheet with one row per quote. Note where each lost quote went quiet: that tells you which message to fix.
| Number | How to count it | What it tells you |
|---|---|---|
| Days to quote | Days from measure to quote sent | Whether design time is costing you jobs |
| Open quotes by step | How many sit at quoted, comparing, selections and waiting on a slot | Where the pipeline is stuck, and what to send next |
| Days since last contact | For each open quote, days since you last sent anything | Anything over 14 is drifting |
| Win rate | Jobs signed, divided by quotes sent, with direct and builder jobs counted separately | The number that pays; note the step and reason for every loss |
| Repeat jobs | Robes, laundries and vanities from past kitchen clients this year | Whether the handover question and the follow-on messages are working |
Compare your own numbers month to month rather than against someone else’s benchmark. If quotes die before day 14, it is the price or the first week of follow-up. If they die after selections, it is the slot or the deposit conversation.
Frequently asked questions
How soon should a cabinet maker follow up a kitchen quote?
Two days after it goes out, by text, to check it arrived and offer a quick call. Then at day 7 with an email that answers the questions people ask about benchtops, timing and deposit, and once more at day 14 if they are comparing quotes. After that, follow the job rather than the calendar: after the selections meeting, and before your next manufacture slot fills. Stop the moment they say no.
How much deposit can a cabinet maker take in WA?
For a home building work contract between $7,500 and $500,000, the usual cap is 6.5% of the contract price. Cabinet makers have an exception: where the contract is for cabinetry work (custom-made cabinets, not off-the-shelf ones) and the off-site work is worth more than half the contract price, the deposit can be up to 20%. On a $20,000 kitchen that is $1,300 at 6.5% or $4,000 at 20%. This is regulation 3A of the Home Building Contracts Regulations 1992, current as of the official version dated 1 September 2025 and the Building and Energy page updated in September 2026. The Act is under review, so check the current rules before you rely on them.
Should I follow up quotes that came through a builder?
Follow up the builder, not the homeowner. The homeowner is the builder’s client and the contract runs through the builder. Send your follow-up to the estimator or supervisor who asked for the price, ask when the client’s selections close, and if the homeowner contacts you directly, keep the builder in the loop. Do not add the homeowner to your own marketing list.
How do I answer a client who says flat-pack is cheaper?
Agree that it usually is, then help them compare like with like. Flat-pack prices often cover the boxes and standard doors, with assembly and installation on top, while a cabinet maker’s price is usually installed. Ask what their flat-pack price includes, show what yours includes line by line, and if flat-pack genuinely suits their budget and kitchen, say so. Being straight about it is what gets you the robes and the laundry later.
Can I text past kitchen clients about wardrobes or a laundry?
Only with care. Consent to marketing can be inferred from an existing relationship, but only where what you promote is directly related to it. A check-up on the kitchen you made fits. Robes or a laundry are more of a stretch, so the safe path is to ask at handover whether they are happy to hear from you about other cabinetry. Every promotional message names your business and carries a working opt-out.
Can you run this follow-up for me?
Yes. We set up the day 2, day 7 and day 14 follow-up and the selections and slot messages from your quoting tool or job software, in your voice, with your business name on every message and a working STOP on anything that promotes, and we stop it the moment a client replies. We do not sell leads. Setup is $999 for the first three clients and $1,500 after that, then $197 a month, and the first 8 booked estimates are free.
If you would rather not run it yourself
Everything above works with a phone, an email account and a spreadsheet. If you would rather it happened without you, we build and run it: the day 2, day 7 and day 14 follow-up triggered from your quoting tool, the selections and slot messages, and the robes-and-laundry message to past clients who said yes at handover, all in your voice with your business name and a working STOP. We do not sell leads; we follow up the ones you already have. Setup is $999 for the first three clients and $1,500 after that, then $197 a month, and the first 8 booked estimates are free. We do not have an Australian client to show you yet, so there is no case study here. The details are on the renovators page, or book a half-hour call.
Sources
Every figure above traces to one of these. All checked 21 October 2026; prices as on the linked pages.
- Joyce Kitchens — Affordable kitchen cabinets Perth. A Perth cabinet maker’s indicative pricing: installed cabinetry $12,000 to $22,000 for a standard family kitchen and $20,000 to $35,000+ with a pantry or butler’s pantry; flat-pack or assembled cabinets about $300 to $900 per linear metre for boxes and standard doors, installation extra; custom melamine or thermofoil about $1,200 to $2,200 per linear metre installed; manufacture 2 to 4 weeks after design approval, installation 2 to 5 days.
- What’s the Damage — Kitchen renovation cost Perth (updated October 2026). Custom cabinetry (cabinet maker) $12,600 to $36,750, $19,950 typical; a budget renovation with flat-pack cabinetry (it names kaboodle, IKEA Metod and Kinsman) $12,600 to $26,250 including a laminate benchtop and entry-level appliances. GST included. A cost-guide website, not a cabinet maker.
- QN Designs — Kitchen process. A Perth kitchen maker: planning and selections typically 2 weeks; manufacturing typically 5 weeks; generally 6 to 8 weeks from the final fabrication meeting to a fabricated and installed kitchen.
- Cabinet Makers Association of WA — Things to consider. A detailed plan and specification list helps make sure the quotes a homeowner gets are for exactly the same work; some quotes come in lower on lower-end specifications.
- Cabinet Makers Association of WA — Buyer beware. Most people get three or four quotes; quotes on the same criteria are generally within 5 to 10% of each other; materials are usually around 50% of the cost; a quote considerably lower than the others should be discounted.
- Building and Energy, WA Government — Industry Bulletin 130 (May 2020). “Builders” under the Home Building Contracts Act include cabinet makers; 6.5% maximum deposit on contracts of $7,500 to $500,000; up to 20% where off-site cabinetry work is more than 50% of the contract price; cabinetry work means custom-made cabinets and fitments, not off-the-shelf cabinets; the Notice for the homeowner was amended to show the exception.
- WA legislation — Home Building Contracts Regulations 1992, official version as at 1 September 2025. Regulation 3A: a deposit of not more than 20% where the contract is for cabinetry work and off-site work is more than 50% of the total payable; the prescribed notice says 20% where regulation 3A applies and 6.5% otherwise.
- Building and Energy, WA Government — Building or renovating your home (updated 21 September 2026). Home-building work includes cabinetry; contracts of $7,500 to $500,000 are covered by the Act; maximum deposit 6.5%, no limit outside that range; a deposit of up to 20% for off-site cabinetry work over 50% of the contract value; Notice for the homeowner before signing; contracts in writing and signed by both parties.
- Building and Energy, WA Government — Review of Western Australia’s home building contract laws (updated 25 June 2026). The Home Building Contracts Act is under review: discussion paper consultation ran 13 May to 24 June 2026, with final recommendations due to government in September 2026 unless extended.
- Cabinet Makers Association of WA — Home indemnity insurance and other regulations. Home indemnity insurance applies to work that needs a building permit and is worth $20,000 or more, so it is not required for stand-alone trade contracts such as cabinet making.
- Wardrobe Man — Built-in wardrobe cost in Perth (updated 28 July 2026). A Perth wardrobe maker: $2,000 to $12,000+; two bays from $3,265, three bays from $5,419, five bays from $8,858. A maker’s own pricing.
- Buildxact — State of the Customer report release (25 March 2026). Estimates sent within 2 days have a 32% win rate, falling after that. From the user base of a global software company: vendor data, not an Australia-only or cabinetry figure.
- Addisons — The ACMA’s expectations for using consent. Consent can be express or inferred from an existing relationship; inferred consent needs the promotion to be directly related to that relationship; the ACMA considers express consent best.
- Prosper Law — Unsubscribe requests and the five-day rule. Opt-outs must be actioned within five business days; the unsubscribe must keep working for at least 30 days after sending.
Every quote followed up in your voice, stopped the moment they reply.
GuideCustomer reactivationThe timed text to past customers, with the consent rule and templates.
GuideSMS compliance for tradiesConsent, identification, unsubscribes and the penalties, in plain English.
More for Perth trade businesses: every article and free tool.